Live Tech Chat


Lago Vista High School

Lago Vista High School

Austin, Texas


On November 8, 2011, voters of Lago Vista Independent School District approved a $29.6 million bond referendum to fund construction, acquisition, renovation and equipment of school facilities. Ground broke for the new and improved high school on November 19, 2012 and has finally come to completion in time for the upcoming 2014 school year. The building is clad with Fabral’s Fabrib for the walls and site formed Powerseam with shadowlines for the roof.

Project Details

    • 26 gauge Stone Gray Fabrib
    • Site formed 16″ x 24 gauge Galvalume Clear Coat Powerseam
    • Acoustical Engineer: Brent Smith – Boner Associates Inc
    • Architect: Mike Shelford – Fromberg Associates Ltd
    • Civil Engineer: Larry Fisher – Hagood Inc
    • Construction Manager: Baird Williams Construction Ltd
    • Lighting: Texas Scenic Company
    • Mechanical and Electrical Engineer: Keith Mavs – Hendrix Consulting Engineers
    • Owner: Robert Zingelmann – Lago Vista ISD
    • Structural Engineer: Gary Jaster – Jaster Quintanilla & Associates



Product Details

PowerSeam is a mechanically seamed structural standing seam roof system with curving and tapering capabilities.

powerseam_t4 powerseam-flat-and-rib-w-shadow1


To review PowerSeam panel spec files, click here


Fabrib is an economical and versatile wall or roof panel with bold design appeal.

fabrib fabrib 2d


To review Fabrib panel spec files, click here

Color Details

Fabral colors Stone Gray and Clear Coated Galvalume were chosen for this project.  These colors support the sustainable initiative.

To review our comprehensive color offering, click here

Skip to toolbar